We are construction firm, offering a wide range of services from residential projects to large scale infrastructure development. We are committed to delivering high quality, sustainable and innovative construction solutions.

Imagine David and Rehema, a couple in Washington. They asked three builders in Moshi for a price on a three bedroom villa. Two came back with long documents. The third sent one number, per square metre, and it was the lowest by far. They chose it.

 

Anyone would.Six months later, the messages began. “The roof was not included.” “Windows are extra.” “The wall around the plot is a separate job.” By the end, the cheap house had cost more than the most expensive quote, and taken a year longer.

David and Rehema were not foolish. They were given a number that left out half the house.

What moves the price

  • Size and shape. Every corner and extra roof line adds cost. A simple, well designed plan can feel larger than a complicated one.
  • The ground. Rock, slopes or soft soil change the foundations, which is why we test the soil before we price.
  • On the islands, most materials travel by sea.
  • Tiles, doors, kitchen and bathrooms can move the budget more than the structure.
  • Solar, heat pumps and water tanks cost more on day one and save money every month after.
  • Outside the house. Wall, gate, pool, staff quarters, driveway and garden, often forgotten in early estimates.

Five questions to ask any quote

  1. Does it include design, engineering and permits?
  2. Does it include the roof, windows, doors and all finishes?
  3. Does it include the boundary wall, gate and external works?
  4. Does it include water and power connections?
  5. Is it a bill of quantities, measured line by line, or just a number?

A price you can trust

At Lango, you receive a full bill of quantities before you commit: every item measured and priced. You can question it, compare it and decide where to spend and where to save. Then you pay in stages, only for finished work.

Imagine David and Rehema starting again. Their quote is longer, and at first it looks higher. But it does not move. Eighteen months later, they stand on their veranda in Moshi, Kilimanjaro clear in the morning light, and the house cost what the bill of quantities said, with every change agreed with them in writing first.

That is what value for money really means.

Frequently asked questions

How much does it cost to build a house in Tanzania? It depends on the size and shape of the house, the ground, the location, the finishes and the systems. The reliable answer is a full bill of quantities based on your plot and design.

Why does building on the islands cost more? Most materials reach Zanzibar, Pemba and Mafia by sea, which adds transport cost and time.

Next step: tell us your plot, the size of home and the finish you want on WhatsApp, +255 783 061 448, and we will prepare a budget estimate.